Thursday, February 28, 2008

Petrolifera Petroleum Limited Cases Puesto Morales Este X-1001 Well

Drilling
The well is created by drilling a hole 5 to 30 inches (13 – 76 cm) diameter into the earth with an oil platform which rotates a drill bit. After the hole is drilled, a steel pipe (casing) slightly smaller than the hole is placed in the hole, and secured with cement. The casing provides structural integrity to the newly drilled wellbore in addition to isolating potentially dangerous high pressure zones from each other and from the surface.

With these zones safely isolated and the formation protected by the casing, the well can be drilled deeper (into potentially more-unstable and violent formations) with a smaller bit, and also cased with a smaller size casing. Modern wells often have 2-5 sets of subsequently smaller hole sizes drilled inside one another, each cemented with casing.



After drilling and casing the well, it must be 'completed'. Completion is the process in which the well is enabled to produce oil or gas.


In a cased-hole completion, small holes called perforations are made in the portion of the casing which passed through the production zone, to provide a path for the oil to flow from the surrounding rock into the production tubing. In open hole completion, often 'sand screens' or a 'gravel pack' is installed in the last drilled, uncased reservoir section.

These maintain structural integrity of the wellbore in the absence of casing, while still allowing flow from the reservoir into the wellbore. Screens also control the migration of formation sands into production tubulars and surface equipment, which can cause washouts and other problems, particularly from unconsolidated sand formations in offshore fields.


After a flow path is made, acids and fracturing fluids are pumped into the well to fracture, clean, or otherwise prepare and stimulate the reservoir rock to optimally produce hydrocarbons into the wellbore. Finally, the area above the reservoir section of the well is packed off inside the casing, and connected to the surface via a smaller diameter pipe called tubing.

This arrangement provides a redundant barrier to leaks of hydrocarbons as well as allowing damaged sections to be replaced. Also, the smaller diameter of the tubing produces hydrocarbons at an increased velocity in order to overcome the hydrostatic effects of heavy fluids such as water.

In many wells, the natural pressure of the subsurface reservoir is high enough for the oil or gas to flow to the surface. However, this is not always the case, especially in depleted fields where the pressures have been lowered by other producing wells, or in low permeability oil reservoirs. Installing a smaller diameter tubing may be enough to help the production, but artificial lift methods may also be needed. Common solutions include downhole pumps, gas lift, or surface pump jacks.

The use of artificial lift technology in a field is often termed as "secondary recovery" in the industry. Many new systems in the last ten years have been introduced for well completion. Multiple packer systems with frac ports or port collars in an all in one system have cut completion costs and improved production, especially in the case of horizontal wells. These new systems allow casings to run into the lateral zone with proper packer/frac port placement for optimal hydrocarbon recovery.

[edit] Production
The production stage is the most important stage of a well's life, when the oil and gas are produced. By this time, the oil rigs and workover rigs used to drill and complete the well have moved off the wellbore, and the top is usually outfitted with a collection of valves called a "Christmas Tree". These valves regulate pressures, control flows, and allow access to the wellbore in case further completion work is needed. From the outlet valve of the Christmas Tree, the flow can be connected to a distribution network of pipelines and tanks to supply the product to refineries, natural gas compressor stations, or oil export terminals.


As long as the pressure in the reservoir remains high enough, this Christmas Tree is all that is required to produce the well. If the pressure depletes and it is considered economically viable, an artificial lift method mentioned in the completions section can be employed.

Petrolifera Petroleum Limited Cases Puesto Morales Este X-1001 Well
15:49 EST Thursday, February 28, 2008

CALGARY, Feb. 28 /CNW/ - Petrolifera Petroleum Limited (PDP - TSX) announces today that it has drilled, logged and cased the PME X-1001 well on its recently-acquired Puesto Morales Este Concession located in the province of Rio Negro in the Neuquén Basin, onshore Argentina.
The well encountered several zones of interest and will be evaluated once a service rig is available to conduct testing programs.


Petrolifera Petroleum Limited is a Calgary-based crude oil and natural gas exploration and production company with operations in Argentina, Colombia and Peru.

Forward Looking Information
This press release contains forward-looking information, including but not limited to planned testing of the PME X-1001 well, which has been cased for further evaluation. There can be no assurance that testing of this well will yield commercial results. The information is based on current expectations that involve a number of risks and uncertainties, which could cause actual results to differ materially from those anticipated. These risks include, but are not limited to risks associated with the oil and gas industry (e.g. operational risks in development, exploration and production delays or changes in plans with respect to exploration or development projects or capital expenditures; the uncertainty of reserve estimates; the uncertainty of estimates and projections in relation to production, costs and expenses and health, safety and environmental risks), the risk of commodity price and foreign exchange rate fluctuations, the uncertainty associated with negotiating with foreign governments and risk associated with international activity. Additional risks and uncertainties are described in the company's Annual Information Form which is filed on SEDAR at www.sedar.com.

Search The Web